Posted 2 Oct 2026
Propulsion Fluidics Engineer
🇨🇭 Villeneuve, SwitzerlandEngineering
Original posting — from PAVE SpaceOpen original
Two fluidic systems need to go from nothing to flight-qualified in the next 18 months. You'd own both.
Two fluidic systems need to go from nothing to flight-qualified in the next 18 months. You'd own both.